Weatherproofing

Work on board continues with weatherproofing of the focle, where a drip strip has been fitted above the door to stop the water running down the inside of the door and flashband has been applied over the holes as a temporary measure until a new plate is welded or riveted in. Steel caps have also been fabricated to fit over other holes in the deck where the mast and chimneys would have passed through.