Hull steelworks progressing well

Posted on 30/08/2016 by Stephen Attenborough

20160819_075548.jpg

The steelworkers have been busy on Freshspring for over two weeks now and are making good progress, working from the bow to aft. There are currently three teams working, two are positioning and tacking on the plates, with the last building up the seam welds. Rather than craning the plates into place, hooks are welded onto the hull and chain blocks are…

Read more

Priming the hull

Posted on 16/08/2016 by Stephen Attenborough

SAM_1002.jpg

The ship has received a fresh look over the weekend as contractors gave the hull a quick wash off before applying the first coat of paint to the bottom for probably nearly forty years. This paint is a 'holding' primer to slow down rust while the steelworks take place, but can be welded through, so there is no need for the steelwork contracotrs…

Read more

Hull cleaning works

Posted on 14/08/2016 by Stephen Attenborough

one.jpg

The day following settling onto the blocks saw, after a gangway was lowered into place by the shipyard, the hull blasting start. The object of this exercise is to clean off all paint, scale and rust from the hull so we can get a much better idea of the condition of the hull plating. The hull blasting process only uses ultra-high pressure water (30,000psi)…

Read more

Down onto the blocks

Posted on 03/08/2016 by Stephen Attenborough

dock1.jpg

On Sunday 31st July 2016, Freshspring was moved from her holding berth where she has been waiting since the tow from Newnham and into the drydock at Sharpness. Once tied up alongside, the shipyard spent some time getting Freshspring on a more even keel. She usually lists to starboard, probably due to the fuel oil pumping equipment in the boiler room,…

Read more